Mackex Services delivered high-voltage electrical infrastructure upgrades at Centennial Coal’s Mandalong underground coal mine in the Hunter Valley, including construction of a new 33kV powerline connecting the Mine Main Air Surface Substation (MMAS) to the Mine Shaft Surface Substation (MSSS) and electrical infrastructure for an EDL 8MW waste-gas power station on site.
